Estimate, Freeze, and Run a Data Center FactSim Study

Use this workflow after the data center scenario, baseline, CAD resource, and Model Asset are ready. FactSim keeps the estimated work, frozen inputs, execution stages, result identity, and review evidence connected to the same scenario.

Module availability and execution limits depend on the active tenant profile.

Prerequisites

RequirementCheck
Scenario and baselineThe engineering question, baseline, changed scenario, and comparison criteria are reviewed.
Versioned resourcesCAD, Model Asset, component geometry, and baseline resources have stable versions and checksums.
Execution profileThe tenant has an admitted FactSim profile, available capacity, and an accepted cost or runtime limit.
PermissionsThe operator has the required view, manage, run, audit, and report permissions for the intended steps.
Review ownershipThe engineering reviewer and report owner are assigned before submission.

Permissions

TaskPermission
View configuration, bindings, and runsdcops.factsim.view
Estimate and freeze inputsdcops.factsim.manage
Submit or cancel a rundcops.factsim.run
Reconcile execution evidencedcops.factsim.audit
Render and publish a reportdcops.factsim.report

Run workflow

Estimate the run

  1. Open Data Center Operations > Engineering Validation > Scenario Lab.
  2. Select the scenario.
  3. Select a CAD resource version.
  4. Select the scenario baseline.
  5. Select the matching Model Asset version.
  6. Choose Estimate.
  7. Review the estimated cell count, runtime, cost, currency, and expiry time.

An estimate is tied to the selected resource versions and execution profile. Re-estimate after changing geometry, the baseline, the Model Asset, or an expired estimate.

Freeze the inputs

Choose Freeze inputs after the estimate and engineering assumptions have been reviewed. The frozen binding records:

  • baseline resource and checksum;
  • CAD resource and version checksum;
  • Model Asset and version checksum;
  • component geometry set;
  • execution profile and runtime contract;
  • estimate and binding checksums.

Frozen inputs remain immutable for that run. Create a new binding when an input or execution profile changes.

Submit and monitor

Choose Submit run after the binding is frozen. The progress view follows four stages:

StageMeaning
CAD preparationValidates and prepares the selected geometry for execution
Thermal-fluid runExecutes the admitted solver profile
Audit gateChecks result identity, required evidence, and completion state
Report renderBuilds the governed result package after reviewer action

You may leave the page while a long-running job is active and return to the same run record. Use Cancel run when the scenario is no longer needed. GPU time already consumed by the run cannot be recovered.

Recover from a problem

Message or stateResponse
Estimate expiredRun the estimate again and review the new values
Version has no checksumSelect or create a resource version with a completed checksum
Tenant slots are in useWait for an active run to finish or cancel an unnecessary run
CAD preparation failedReview geometry, domain size, supported formats, and cell estimate
Thermal-fluid run failedReview inputs and limits, then retry or prepare a smaller scenario
Audit gate failedReview result evidence and input identity before submitting again
State appears staleUse Reconcile when authorized, then review the latest stage evidence

Expected output

A completed execution reaches Ready for report with a result reference, checksum, stage evidence, and the frozen input identity. Continue with Review and Publish Data Center Simulation Evidence.