Review Smart District Heating Dispatch Safety and Evidence

Use this workflow to move a forecast, anomaly finding, or simulation result into an accountable operating decision. The same review path applies whether the outcome is an inspection, a work order, a manual adjustment, or a project-approved control-system action.

Prerequisites

  • Named operations approver and execution owner.
  • Project-approved constraints for each controllable parameter.
  • Readback, audit, rollback, and manual-override procedures.
  • Stable links to station, equipment, scenario, and work records.
  • A method for recording the measured outcome.

Decision flow

Review a recommendation

  1. Confirm the source evidence, network scope, time window, and recommendation version.
  2. Review requested supply temperature, pressure, flow, valve, ramp, schedule, and affected-zone values that apply to the project.
  3. Run the project constraint check and inspect warnings, blocked values, and any adjusted values.
  4. Compare the recommendation with current equipment state, active work, manual overrides, and weather updates.
  5. Record approval, rejection, requested change, execution owner, and expiration time.
  6. Execute through the approved operating path.
  7. Verify command readback, station and zone response, alarms, comfort evidence, and rollback conditions.
  8. Link the outcome to the operation log, work order, forecast, anomaly, or scenario record.

Minimum evidence record

FieldPurpose
Source recordLinks the decision to a forecast, anomaly, simulation, or operator finding.
Input and model versionReproduces the recommendation context.
Constraint resultShows passed, warned, blocked, or adjusted parameters.
Approver and executorEstablishes accountability.
Action and readbackRecords what was requested and what the control system reported.
Rollback and overrideShows the available safe recovery path.
Measured outcomeCaptures temperature, pressure, flow, heat, comfort, alarm, and work result as applicable.

Execution modes

ModeUse
Recommendation onlyDefault for early deployment, uncertain data, or incomplete control integration.
Approved manual actionAn operator applies the accepted recommendation through existing procedures.
Controlled write integrationA project-specific integration writes after approval and returns command and state evidence.
Emergency responseExisting control and manual procedures take priority when triggers or safety conditions require them.

Validation checklist

  • The recommendation still matches the current weather, equipment, and station state.
  • The project constraint set and approver are recorded with the decision.
  • The requested action, returned state, and any adjusted value are visible in the audit record.
  • Rollback and manual override have been confirmed before execution.
  • The measured outcome is linked to the originating evidence and work record.

Failure handling

ProblemResponse
Constraint configuration is missingKeep the result as a recommendation and involve the control-system owner.
Command readback differs from the requestStop dependent actions, preserve evidence, and follow the rollback procedure.
Weather or station state changes before executionExpire the recommendation and recompute or rereview it.
Outcome cannot be measuredKeep the action open and create an inspection or data-repair task.
Recommendation causes an adverse trendFollow the recovery playbook and retain the complete timeline for engineering review.